Ca' Gabriel

ca-gabriel_zenitale.jpg
Prospettive_Orizzonti_Ca_Gabriel_part_2019.jpg
FDO_CA GABRIEL_1.jpg
ca-gabriel_zenitale.jpg
Prospettive_Orizzonti_Ca_Gabriel_part_2019.jpg
FDO_CA GABRIEL_1.jpg

Ca' Gabriel

$0.00

Ca' Gabriel

OAK SMOKED BRUSHED STAINED VARNISHED

TECHNICAL DATA

OAK BOARD/FIR BACK SUPPORT /3 LAYERS/PREFINISHED 16 MM (5/8”) or 20 MM (3/4”)/TOP LAYER 4,5 MM (5,5 MM ON ANTIQUE STYLE)

TOP LAYER
SINGLE-PLANK NOBLE LAYER IN SOLID WOOD THICKNESS 4,5 MM +/- 5%

ANTIQUE STYLE SINGLE-PLANK NOBLE LAYER IN SOLID WOOD THICKNESS 5,5 MM +/- 5%

BACK SUPPORT
SPECIAL 2 LAYERS FIR PANEL MANUFACTURED BY LATIFOGLIA (FOGLIE D’ORO)

WORKING - FINISHES
BRUSHING, HAND-PLANNING, SAW CUTTING, AGING EFFECT. FINISHED WITH VARNISH, OIL OR WAX

THICKNESS
16MM (5/8”) or 20MM (3/4”)

WIDTHS & LENGTH

MEDIUM:

  • 4.75” OR 5.5” - VARIABLE LENGTHS : 31.50”<87.00”

  • MIX 4.75”/ 7” / 9.5” - VARIABLE LENGTHS : 40.00”<107.0”

LARGE:

  • 7” OR 8” - VARIABLE LENGTHS : 40.00”<100.00”

XLARGE:

  • 9.5” - VARIABLE LENGTHS : 40.00”<107.00”

  • MIX 8”/ 9.5” / 12” - VARIABLE LENGTHS : 40.00”<107.0”

MAXI (JUMBO) - ONLY NATURE QUALITY

  • 9.5”, 12” OR 13.75” - VARIABLE LENGTHS : 100.00”<178.00”

  • MIX 9,5”/ 12”/ 13.75” - VARIABLE LENGTHS : 100.00”<178.00”

ULTRA (JUMBO) - ONLY NATURE QUALITY

  • 15.8”, 17.8” OR 20” - VARIABLE LENGTHS : 100.00”<178.00”

  • MIX 15.8”/ 17.8”/ 20” - VARIABLE LENGTHS : 100.00”<178.00”

QUALITY: RUSTIC / NATURE / SELECT

CERTIFICATION
MADE IN ITALY CE

APPLICABLE CODES
UNI EN 14342 :2005+A1:2008

LAYING
FLOATING OR GLUED

PROFILING AND CONNECTION
TONGUE & GROOVE 4 SIDES + BEVEL

INSTALLATION ON UNDERFLOOR HEATING SYSTEM
SUITABLE (AVOID SURFACE TEMPERATURE ABOVE 28° C. REFER TO EXTENDED LAYING AND MAINTENANCE INSTRUCTIONS)

CLEANING AND MAINTENANCE
CLEAN WITH VACUUM CLEANER OR DAMP CLOTH WELL WRUNG. AVOID CLEANING WITH ALCOHOL, SOLVENTS, AMMONIA BASED PRODUCTS

USE AND MAINTENANCE INSTRUCTIONS
THE FLOORING MUST BE STOCKED IN DRY ENVIRONMENTS. LAYING MUST BE CARRIED OUT AFTER INSTALLATION OF EXTERNAL DOORS AND WINDOWS AND ONCE THE PLASTERING IS FULLY DRY, ALL OTHER FLOORING AND WALL TILES MUST BE ALREADY INSTALLED. ENVIRONMENTAL CONDITIONS: TEMPERATURE BETWEEN 15 AND 25°C AND HUMIDITY BETWEEN 45% AND 60%. RESIDUAL HUMIDITY OF THE SUBFLOOR (CONCRETE SCREED) MUST BE ≤2 %. IN CASE OF SUBFLOORING HEATING SYSTEM INSTALLATION MUST BE CARRIED OUT AND ONLY AFTER ITS TESTING. SUBFLOORING CONDITIONS MUST BE PREVIOUSLY VERIFIED (LEVELING, CONSISTENCY, ETC.) EXCESSES OF GLUE MUST BE IMMEDIATELY REMOVED BY MEANS OF SPECIFIC CLEANING PRODUCTS. AVOID COVERING THE FLOOR WITH RUGS OR FURNITURE UNTIL FLOORING EVENING OUT. IN CASE OF ACCIDENTAL WATER OR LIQUID SPILL MOP AS SOON AS POSSIBLE.

Made in Italy

Add To Cart